{"id":36071,"date":"2026-01-12T12:03:50","date_gmt":"2026-01-12T11:03:50","guid":{"rendered":"https:\/\/www.pittini.it\/?post_type=blog&#038;p=36071"},"modified":"2026-01-12T12:13:31","modified_gmt":"2026-01-12T11:13:31","slug":"the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel","status":"publish","type":"blog","link":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/","title":{"rendered":"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel"},"content":{"rendered":"<p style=\"text-align: justify;\">From <b>6 to 22 February 2026<\/b>, Italy will host the <a href=\"https:\/\/www.olympics.com\/it\/milano-cortina-2026\">XXV Winter Olympic Games<\/a>, which for the first time will see <b>Milan and Cortina d&#8217;Ampezzo<\/b> as joint venues for the event. Among the works carried out in preparation for the event, the redevelopment of the <strong>Cortina Sliding Centre &#8216;Eugenio Monti&#8217;<\/strong> is one of the most significant interventions, bringing a historic winter sports <a href=\"https:\/\/www.pittini.it\/en\/applications\/infrastructure\/\">infrastructure<\/a> back into operation.<\/p>\n<h2>The rebirth of the &#8216;Cortina Sliding Centre&#8217;<\/h2>\n<p style=\"text-align: justify;\">The original track, built in the 1920s and home to numerous international events over the years, has been completely rebuilt to meet current technical standards, while retaining a partial resemblance to the historic track. The new Sliding Centre will host <b>bobsleigh, skeleton and luge<\/b> competitions and is designed to accommodate athletes with disabilities. The track is <b>1,749 metres long, with 16 curves<\/b> allowing athletes to reach a <b>maximum speed of 145 km\/h<\/b>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-36072 size-full\" src=\"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi-1.jpg\" alt=\"\" width=\"1200\" height=\"675\" srcset=\"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi-1.jpg 1200w, https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi-1-300x169.jpg 300w, https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi-1-1024x576.jpg 1024w, https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi-1-768x432.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<h2>Pittini steel in the construction phases<\/h2>\n<p style=\"text-align: justify;\">The project involved around 135 people between February 2024 and March 2025, with over 300 days of activity on a construction site located in an area of outstanding natural beauty. The lead contractor, Pizzarotti, coordinated 35 subcontractors and 115 suppliers.<\/p>\n<p style=\"text-align: justify;\">Among these was the <strong>Pittini Group<\/strong>, which supplied <a href=\"https:\/\/www.pittini.com\/en\/products\/building-sector\/jumbo-coils\/\">Jumbo\u00ae rolled steel<\/a> in <strong>diameters of 10-16 mm<\/strong>, a solution suitable for ensuring <strong>rapid installation and continuity during the construction phases<\/strong>. The use of this material contributed to meeting the construction deadlines, a crucial factor for a project linked to an international event such as the Olympic Games.<\/p>\n","protected":false},"featured_media":36070,"template":"","class_list":["post-36071","blog","type-blog","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel - Pittini Group<\/title>\n<meta name=\"description\" content=\"Rebuilt in preparation for Milan Cortina 2026, the new bobsleigh track in Cortina also incorporates Pittini steel. The work was completed quickly and is ready for the upcoming Olympics.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel - Pittini Group\" \/>\n<meta property=\"og:description\" content=\"Rebuilt in preparation for Milan Cortina 2026, the new bobsleigh track in Cortina also incorporates Pittini steel. The work was completed quickly and is ready for the upcoming Olympics.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/\" \/>\n<meta property=\"og:site_name\" content=\"Pittini Group\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-12T11:13:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"802\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/\",\"url\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/\",\"name\":\"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel - Pittini Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pittini.it\\\/wp-content\\\/uploads\\\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg\",\"datePublished\":\"2026-01-12T11:03:50+00:00\",\"dateModified\":\"2026-01-12T11:13:31+00:00\",\"description\":\"Rebuilt in preparation for Milan Cortina 2026, the new bobsleigh track in Cortina also incorporates Pittini steel. The work was completed quickly and is ready for the upcoming Olympics.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pittini.it\\\/wp-content\\\/uploads\\\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pittini.it\\\/wp-content\\\/uploads\\\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg\",\"width\":2000,\"height\":802,\"caption\":\"pista cortina\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Articoli #BeAhead\",\"item\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/\",\"name\":\"Pittini Group\",\"description\":\"A group of companies that manage to cover all the production process\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel - Pittini Group","description":"Rebuilt in preparation for Milan Cortina 2026, the new bobsleigh track in Cortina also incorporates Pittini steel. The work was completed quickly and is ready for the upcoming Olympics.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/","og_locale":"en_US","og_type":"article","og_title":"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel - Pittini Group","og_description":"Rebuilt in preparation for Milan Cortina 2026, the new bobsleigh track in Cortina also incorporates Pittini steel. The work was completed quickly and is ready for the upcoming Olympics.","og_url":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/","og_site_name":"Pittini Group","article_modified_time":"2026-01-12T11:13:31+00:00","og_image":[{"width":2000,"height":802,"url":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg","type":"image\/jpeg"}],"twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/","url":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/","name":"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel - Pittini Group","isPartOf":{"@id":"https:\/\/www.pittini.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/#primaryimage"},"image":{"@id":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg","datePublished":"2026-01-12T11:03:50+00:00","dateModified":"2026-01-12T11:13:31+00:00","description":"Rebuilt in preparation for Milan Cortina 2026, the new bobsleigh track in Cortina also incorporates Pittini steel. The work was completed quickly and is ready for the upcoming Olympics.","breadcrumb":{"@id":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/#primaryimage","url":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg","contentUrl":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-pista-cortina-olimpiadi.jpg","width":2000,"height":802,"caption":"pista cortina"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pittini.it\/en\/blog\/the-curves-of-the-cortina-ski-slope-glide-over-pittini-jumbo-steel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pittini.it\/en\/"},{"@type":"ListItem","position":2,"name":"Articoli #BeAhead","item":"https:\/\/www.pittini.it\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"The curves of the Cortina ski slope glide over Pittini Jumbo\u00ae steel"}]},{"@type":"WebSite","@id":"https:\/\/www.pittini.it\/en\/#website","url":"https:\/\/www.pittini.it\/en\/","name":"Pittini Group","description":"A group of companies that manage to cover all the production process","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pittini.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/blog\/36071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/types\/blog"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/media\/36070"}],"wp:attachment":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/media?parent=36071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}