{"id":33663,"date":"2023-07-11T11:09:43","date_gmt":"2023-07-11T09:09:43","guid":{"rendered":"https:\/\/www.pittini.it\/?post_type=green-at-pittini&#038;p=33663"},"modified":"2023-11-27T17:33:10","modified_gmt":"2023-11-27T16:33:10","slug":"the-investment-in-photovoltaic-power-stations-continues","status":"publish","type":"green-at-pittini","link":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/","title":{"rendered":"The investment in photovoltaic power stations continues"},"content":{"rendered":"<h2>New installations<\/h2>\n<p style=\"text-align: justify;\">In early 2023, the photovoltaic systems already present at the <a href=\"https:\/\/www.pittini.it\/en\/the-group\/companies\/ferriere-nord\/\">Osoppo<\/a> mill were expanded and upgraded in terms of efficiency. In fact, new panels were installed over the warehouse dedicated to the storage of <a href=\"https:\/\/www.pittini.com\/en\/products\/building-sector\/jumbo-coils\/\" target=\"_blank\" rel=\"noopener\">Jumbo\u00ae rebar<\/a>, and the panels already present in the area adjacent to the gatehouse were revamped, improving their efficiency. These new systems are equipped with <strong>power optimizers<\/strong>, which improve their efficiency.<\/p>\n<h2>State-of-the-art technologies<\/h2>\n<p style=\"text-align: justify;\">Photovoltaic systems are very efficient but they are not free from maintenance and control. All the panels can be monitored remotely via a <strong>cloud-based platform<\/strong>, which provides information on their status, any anomalies and the energy they are producing. In addition, the new systems installed at the Osoppo site are equipped with <strong>12 robots for automatic washing<\/strong>, which guarantee constant cleaning of the modules for a constant yield. A new &#8220;<strong>dry<\/strong>&#8221; technology is also adopted for the latter, which also enables dry cleaning.<\/p>\n<h2>Towards sustainable energy<\/h2>\n<p style=\"text-align: justify;\">Thanks to these investments, the installed capacity is going to increase <strong>from 168kWp to<\/strong> <strong>1,569kWp<\/strong> for the system installed on the Jumbo\u00ae warehouse, and <strong>from 800kWp to<\/strong> <strong>1,092kWp<\/strong> for the system next to the gatehouse. The expected annual production is more than <strong>3 GWh\/year<\/strong>.<\/p>\n<p style=\"text-align: justify;\">Further installations are already planned for the future, not only for the site in Osoppo but also for the other companies of the Group.<\/p>\n","protected":false},"featured_media":33656,"template":"","class_list":["post-33663","green-at-pittini","type-green-at-pittini","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The investment in photovoltaic power stations continues - Pittini Group<\/title>\n<meta name=\"description\" content=\"Expansions and improvements for photovoltaic facilities at the Osoppo plant of the Pittini Group.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The investment in photovoltaic power stations continues - Pittini Group\" \/>\n<meta property=\"og:description\" content=\"Expansions and improvements for photovoltaic facilities at the Osoppo plant of the Pittini Group.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/\" \/>\n<meta property=\"og:site_name\" content=\"Pittini Group\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-27T16:33:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"802\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/\",\"url\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/\",\"name\":\"The investment in photovoltaic power stations continues - Pittini Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pittini.it\\\/wp-content\\\/uploads\\\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg\",\"datePublished\":\"2023-07-11T09:09:43+00:00\",\"dateModified\":\"2023-11-27T16:33:10+00:00\",\"description\":\"Expansions and improvements for photovoltaic facilities at the Osoppo plant of the Pittini Group.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pittini.it\\\/wp-content\\\/uploads\\\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pittini.it\\\/wp-content\\\/uploads\\\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg\",\"width\":2000,\"height\":802,\"caption\":\"parchi pannelli fotovoltaici\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/sustainability\\\/greenatpittini\\\/the-investment-in-photovoltaic-power-stations-continues\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The investment in photovoltaic power stations continues\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/\",\"name\":\"Pittini Group\",\"description\":\"A group of companies that manage to cover all the production process\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pittini.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The investment in photovoltaic power stations continues - Pittini Group","description":"Expansions and improvements for photovoltaic facilities at the Osoppo plant of the Pittini Group.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/","og_locale":"en_US","og_type":"article","og_title":"The investment in photovoltaic power stations continues - Pittini Group","og_description":"Expansions and improvements for photovoltaic facilities at the Osoppo plant of the Pittini Group.","og_url":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/","og_site_name":"Pittini Group","article_modified_time":"2023-11-27T16:33:10+00:00","og_image":[{"width":2000,"height":802,"url":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg","type":"image\/jpeg"}],"twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/","url":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/","name":"The investment in photovoltaic power stations continues - Pittini Group","isPartOf":{"@id":"https:\/\/www.pittini.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/#primaryimage"},"image":{"@id":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg","datePublished":"2023-07-11T09:09:43+00:00","dateModified":"2023-11-27T16:33:10+00:00","description":"Expansions and improvements for photovoltaic facilities at the Osoppo plant of the Pittini Group.","breadcrumb":{"@id":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/#primaryimage","url":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg","contentUrl":"https:\/\/www.pittini.it\/wp-content\/uploads\/Gruppo-Pittini-parchi-pannelli-fotovoltaici.jpg","width":2000,"height":802,"caption":"parchi pannelli fotovoltaici"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pittini.it\/en\/sustainability\/greenatpittini\/the-investment-in-photovoltaic-power-stations-continues\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pittini.it\/en\/"},{"@type":"ListItem","position":2,"name":"The investment in photovoltaic power stations continues"}]},{"@type":"WebSite","@id":"https:\/\/www.pittini.it\/en\/#website","url":"https:\/\/www.pittini.it\/en\/","name":"Pittini Group","description":"A group of companies that manage to cover all the production process","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pittini.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/green-at-pittini\/33663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/green-at-pittini"}],"about":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/types\/green-at-pittini"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/media\/33656"}],"wp:attachment":[{"href":"https:\/\/www.pittini.it\/en\/wp-json\/wp\/v2\/media?parent=33663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}